Annual Training Camp
The camp every cadet attends. The kit every unit needs.
Unit / Directorate · Army, Naval, Air · JD, JW, SD, SW · 10 days · Year-round in unit batches — Karnataka & Goa batches typically May–June and October–December
What happens
Drill, weapon training, map reading, field craft, PT, lectures, cultural evenings and a camp-fire. Working dress all day, PT dress every morning.
Who attends
Mandatory for every enrolled NCC cadet. Run by battalions for their units, often combined across units (CATC).
Unit-size batches; every enrolled cadet attends once a year
Dress worn
Annual Camp Pack
Two full working-dress sets so a cadet always has a clean uniform, plus the PT kit and every badge, belt and boot the unit checks at fall-in.
| Item | Qty / cadet | Source |
|---|---|---|
| Shirt PV Khaki | 2 | DBT |
| Trouser PV Khaki | 2 | DBT |
| Beret Rifle Green | 1 | DBT |
| Hackle Red | 1 | DBT |
| Badges (Cap / Pagree) | 1 | DBT |
| Arms Titles | 1 | DBT |
| Badges of Rank & Chevrons | 1 | DBT |
| Lanyard Thin Loop NCC Colour | 1 | DBT |
| Belt Waist Modified (Black) | 1 | LCC |
| Boot DVS Ankle | 1 | DBT |
| Socks NTP Black | 3 | DBT |
| PT T-Shirt (wing colour) | 2 | — |
| PT Shorts / Track Pant | 1 | — |
| Name Plate | 1 | — |
DBT = bought against the cadet's Direct Benefit Transfer allowance · LCC = Life Cycle Clothing, issued by the Local Camp Committee for the tenure and returned after · AUTH = authorised issue, not purchased by the cadet.
FAQ
Can we order for the whole unit in mixed sizes?
Yes. The bulk enquiry takes a size grid per garment — enter counts per size or upload your cadet list and we bin sizes for you.
Do you send a sample before we commit?
Always. One sample set ships within 7 days of the estimate; bulk production starts only after the ANO approves it.
How early should a unit order before camp?
14 days for up to 250 cadets. Larger batches add roughly 3 days per additional 250.